Maintenance and inspection records (most recent month/daily inspection). Crane's most recent annual certification will be required the date of the crane's arrival on-site. Engineering calculation for lifting beams. There is no universal or definitive answer for when a critical lift plan is required, but they are used as a precautionary step to protect load, people, and surrounding property. Larger, heavier duty, purpose-built truck-mounted cranes are constructed in two parts: the carrier, often called the lower, and the lifting component, which. Lift plan submittal with drawings(to be placed in cab of crane before lifting operation begins). Not all lifts are created equal, and for those lifts, we have critical lift plans.
This critical lift plan template is free to use and makes the job of completing and approving critical lifts faster, easier and more safe. 00:00 - Introduction by FSO Ralph Willson04:00 - Lift plan terminology with Brandon Hitch18:10 - Q&A 125:50 - When to use different types of.